Client: |
Renfrew Hydro Electric Commission |
| Location: |
Renfew, Ontario Canada |
| Operational: |
October 1995 |
| Description: |
This facility, which was originally constructed in the first decade of this century, was rehabilitated by Elecsar Engineering. Both stations together have five generators rated at 2000kW with a terminal voltage of 4160V. |
Features:
Arc-resistant, compact SF6 indoor 5kV generator switchgear
Replaced existing on-line shaft driven exciters with solid state exciters
Programmable logic controllers (PLCs) for automatic generator control
Microprocessor based monitoring and control for Renfrew H.E.C. System and Generating Stations
Full protection and control package for generators and exciters