Client: |
Vaughan Hydro Electric Commission |
| Location: |
Vaughan, Ontario Canada |
| Operational: |
1993 |
| Description: |
This installation was designed by Elecsar Engineering to provide system voltage support and improved power factor at the Vaughan H.E.C. Greenwood T.S. With this installation, the effective station transformation capacity is extended 10MW. |
Features:
- 2 x 21.6MVAR capacity
- Utilizes double WYE underground configuration
- Neutral unbalance, overcurrent, overvoltage and undervoltage relay protection
- Utilizes standard 28kV SF6 metalclad switchgear
- Clearances and construction to industrial and CSA standards