Client: |
VaughanHydro Electric Commission |
| Location: |
Vaughan, Ontario Canada |
| Operational: |
May 1989 |
| Description: |
This DESN facility was designed by Elecsar Engineering as the first of its size and voltage in Canada. Greenwood T.S. provides an installed capacity of 250MVA, 230-28kV utilizing an outdoor switchyard and indoor 28kV switchgear. |
Features:
- First use of arc-resistant, compact, SF6 indoor 28kV switchgear
- Self contained, modular station control/relay/SCADA interface
- LPOF, 230kV Ontario Hydro Supply Cables
- 28kV feeder cable egress in polymeric concrete trough
- Clearances and construction to industrial and CSA standards
- Programmable 28kV feeder relaying