Client: |
Vaughan Hydro Electric Commission |
| Location: |
Vaughan, Ontario Canada |
| Operational: |
April 1992 |
| Description: |
This DESN facility was designed by Elecsar Engineering to provide an installed capacity of 250MVA, 230-25kV utilizing an outdoor 230kV switchyard and 28kV switchgear. |
Features:
- Arc-resistant, compact, SF6 indoor 28kV switchgear
- Self contained, modular station control/relay/SCADA interface
- Building architeture integrated with the Toronto Star press facility [$300M]
- Programmable, RS-232 connected feeder relay/control
- LPOF, 230kV Ontario Hydro supply cables